In this post our GIS whizz Ellie Spilsbury outlines some of the work we have been doing to identify ways to improve the sustainability of the fisheries in our rivers and hopefully aid the return of salmon for the first time since the Industrial Revolution.
Visit each of the three sections for more detail:
A familiar Story
Data analysis with a Salmon Splash of professional opinion
(Tr)outcomes expected
Once upon a time, our River Aire had the highest Salmon population of any Yorkshire river. Then came the Industrial Revolution, which saw the wool and fabric industry boom throughout Yorkshire. Mills were constructed accompanied by weirs to harness our river’s energy. Although the mills are now closed and are becoming swanky new flats, the weirs often remain, isolating ecosystems that lie between them. Weirs disrupt the natural transport of sediment downstream, causing a build-up of silt and gravel behind the weir, which is detrimental to the habitat of spawning fish. Since 2011, one of the Aire River Trust’s goals has been to increase the connectivity of our river and its tributaries by removing or re-configuring weirs to allow fish passage. Following earlier work to install fish passes through and downstream of Leeds, significant steps towards this goal were made in 2022 with the successful construction of four fish passes as part of the DNAire project.
When we see water flowing over weirs, creating the sounds of waterfalls and visually pleasing white waters, it is easy to forget their man-made heritage and artificiality. It is hard to imagine seeing through the eyes of a migrating trout or salmon; every cell in its body instinctively directing it upstream to spawn, using both the stars and the earth’s magnetic field for navigation and then facing an unpassable wall of Yorkshire-dressed stone. It is often not just the height of the weir that presents the issue but the combination of weir height and the shallow depth of the concrete sill below the weir. The height at which salmon and trout jump is directly affected by the relative depth of the water at the foot of the barrier and the “hydraulic jump,” which boosts their leap.
The Environment Agency (EA) has identified around four hundred river obstacles within the Aire Catchment. However, we believe there to be many more. For example, the EA recorded two barriers to fish passage on Pitty Beck, yet on our Bradford Becks Walkovers, we found 11. This pattern is most likely repeated on each beck. Currently, tackling the removal of every weir in the catchment is unattainable. So, how did we prioritise them into a workable top twenty?
With help from The Rivers Trust, we are the first regional rivers trust to code an ArcGIS tool to accurately calculate the length of a river (including tributaries and forks) that would be opened and re-connected by the removal of every mapped weir in the Aire Catchment. Alongside this, we analysed ecological assessment data, invertebrate biodiversity, local community data (including deprivation), and weir visibility to the public. We assigned a score to each outcome and designed a weighted decision-making matrix that identified the weirs that scored the most highly. The data only tells us half the story, so we took our results to our expert team and discussed those weirs for which a solution in the short(ish) term might be feasible.
Once we had twenty feasible weirs, it was time to ground truth our ideas. The purpose of site visits is to add or, more often, diminish our confidence in the feasibility of the weir so that we only carry the most achievable sites to the next stage. We evaluated the weirs’ condition, site access, utility services or abstraction points, and landowner engagement by photographing and recording the area, our thoughts, and encounters.
The most surprising discovery for me was the actual size of a weir. After months of viewing photographs without visual perspective, weirs can appear to be half the scale of the real-life structure. Take a moment to analyse this photo: how tall do you believe it to be? See the very bottom of the blog for the upside-down answer.
We are fast approaching the end of the site visits and write-up stage. It is time to narrow our shortlist of twenty weirs down to four. So, it will be back around the table for our professionals to decide on the four “leak” proof projects to invest in. These four weirs will be subject to a comprehensive feasibility study and design process. I hope my next blog post will include more designs, machinery, hard hats and re-naturalised rivers.